THE ESTIMATED NUMBER OF FISH THAT PASSED THE YORK HAVEN HYDROELECTRIC PROJECT THROUGH THE SEPENTINE VERTICAL NOTCH LADDER AT THE EAST CHANNEL DAM, 2 JUNE TO 8 JUNE, 2002.
                   
DATE 2-Jun 3-Jun 4-Jun 5-Jun 6-Jun 7-Jun 8-Jun
  SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY Total for the Week Total for the Year
   
Hours of passage 6.0 5.5 5.5 5.5 6.0 6.0 5.5 40 166.85
Water Tempurature (F) 73.0 71.6 71.0 71.9 73.2 70.0 70.1
                   
American Shad 208 102 89 64 162 60 69 754 1525
Alewife 0 0 0 0 0 0 0 0 1
Blueback herring 0 0 0 0 0 0 0 0 0
Gizzard shad 1678 2803 3868 3276 2749 1607 4548 20529 60247
Hickory shad 0 0 0 0 0 0 0 0 0
Striped bass 0 0 2 3 1 0 0 6 10
White perch 0 0 0 0 0 0 0 0 0
American eel 0 0 0 0 0 0 0 0 0
Other Fish 1441 1294 1271 969 1364 817 1188 8344 43009
Total 3327 4199 5230 4312 4276 2484 5805 29633 104792